Lago Vista Water Damage Restoration

Another 2 day water removal!  Fresh water damage from a toilet that didn’t shut off.  We were able to dry the carpet and pad in place because of the type of pad that was installed.  We did have to drill some holes in the kick plates of the cabinets but didn’t have to remove any of the base molding. 

Some jobs are like this.  We were able to get complete control of the environment and establish very good drying chamber.  In fact, it was so dry after just 2 days that the walls are going to have to take on water to get back to normal moisture levels.

Comments are closed.